Location |
Bogatynia, Poland |
|
Investor: |
Polska Grupa Energetyczna, PGE Group, Poland |
|
Client: |
MHPSE, Mitsubishi Hitachi Power Systems Europe |
|
Scope of services: |
Pipe Support Design for Low, Medium and High Pressure Systems Planning, Calculation, Design, Bill of Material preparation, Piping, Piping Stress Analysis Detail Design Documentation preparation, Secondary steel Calculation 3D support design using Intergraph SmartPlant 3D Piping Stress Analysis using Rohr2 |
|
Programs: |
SmartPlant 3D, LISEGA Licad, Rohr2, Smartsheet |
Turow Thermal Power Station
The consortium Mitsubishi Hitachi Power Systems EuropeGmbH (MHPSE), Budimex S.A. and TécnicasReunidas, S.A., is setting up a highly efficient lignite power plant for Polska Grupa Energetyczna (PGE) in the mining and generation complex at Turów (Poland).
The lignite unit will have a gross capacity of just under 500 MW and an efficiency of over 43 %. As such, the plant will rank amongst the most modern in Europe. MHPSE is to supply the utility steam generator, the entire flue gas cleaning equipment, piping, turbine /generator, the overriding instrumentation & control and will place the power plant into service. Consortium partners Budimex S.A. (Poland) and Técnicas Reunidas,S.A. (Spain) are responsible for construction/erection, the cooling tower, general electrical engineering, steel structures, ducts and some balance-of-plant.
The units to be built on an existing power plant site on which six power plant units with 1,500 MW of installed capacity are located. The symbolic ground-breaking ceremony for the power plant took place in May 2015.